123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172737475767778798081828384858687888990919293949596979899100101102103104105106107108109110111112113114115116117118119120121122123124125126127128129130131132133134135136137138139140141142143144145146147148149150151152153154155156157158159160161162163164165166167168169170171172173174175176177178179180181182183184185186187188189190191192193194195196197198199200201202203204205206207208209210211212213214215216217218219220221222223224225226227228229230231232233234235236237238239240241242243244245246247248249250251252253254255256257258259260261262263264265266267268269270271272273274275276277278279280281282283284285286287288289290291292293294295296297298299300301302303304305306307308309310311312313314315316317318319320321322323324325326327328329330331332333334335336337338339340341342343344345346347348349350351352353354355356357358359360361362363364365366367368369370371372373374375376377378379380381382383384385386387388389390391392393394395396397398399400401402403404405406407408 |
- "采购总资金"
- "预算合计金额(人民币/元)"
- "采购项目预算金额(元)"
- "预算批复金额"
- "项目招标预算金额"
- "预算金额(人民币:元)"
- "预算金额(人民币万元)"
- "预算金额(万元)"
- "预算金额(元)"
- "最高投标限价"
- "项目财政预算"
- "投标总价(元)"
- "总预算"
- "总估算价"
- "总投资估算"
- "投标最高限价"
- "投标最高限价(元)"
- "预算(万元)"
- "预算(元)"
- "预算金额(万元)"
- "采购总预算(元)"
- "预算投资"
- "投标最高限价(元)"
- "本项目预算金额/最高限价"
- "采购预算(万元)"
- "采购限额"
- "预算"
- "预算(元)"
- "預算"
- "预算额"
- "概算金额"
- "概算金额(万元)"
- "最高投标限价(元)"
- "最高投标限价(万元)"
- "最高投标限价(元)"
- "预估总金额"
- "预估含税金额"
- "资金预算"
- "招标预算"
- "采购计划金额(元)"
- "项目预估投资额或规模"
- "预算合计"
- "总预算价"
- "招标控制总价"
- "招标控制金额"
- "包组预算合计"
- "分包控制金额"
- "政府采购预算"
- "投资预算金额"
- "投资预算"
- "最高采购限价"
- "控制预算"
- "估算金额"
- "采购估算金额"
- "估算金额(万元)"
- "项目估算招标金额"
- "分包预算"
- "分包预算金额"
- "标包概算金额"
- "标段合同估算价"
- "标段预算金额"
- "各标段预算金额"
- "采购总预算"
- "合同估算价"
- "合同估算价(元)"
- "估算价"
- "估算价(元)"
- "估算价(万元)"
- "预算内"
- "预算金额"
- "项目概算总投资"
- "本标段最高限价"
- "本标段采购预算"
- "本采购项目总预算金额"
- "预算金额总计"
- "预算总投资"
- "预算控制金额"
- "预算总金额"
- "预算总金额(元)"
- "采购预算金额"
- "采购预算金额(万元)"
- "采购预算金额(元)"
- "采购预算(元)"
- "采购预算控制额度"
- "采购预算及资金来源"
- "招标项目预算金额"
- "标段招标控制价"
- "预算总额(元)"
- "预算总额"
- "预算资金"
- "预算控制额度"
- "采购预算合计"
- "预算费用"
- "投资估算额"
- "财政预算资金"
- "采购控制价金额"
- "采购预算"
- "采购预算单价总和"
- "项目总预算控制价"
- "项目采购预算价"
- "预金额"
- "含税预算"
- "每包控制金额"
- "釆购项目预算金额"
- "项目预算"
- "项目预算(万元)"
- "项目预算(元)"
- "预算造价"
- "本项目的招标控制价"
- "本标段投资额"
- "本标项目的招标控制金额"
- "采购预算总价"
- "预算总价(万元)"
- "采购预算总价(万元)"
- "采购有效期内年度预算"
- "项目采购预算"
- "项目预算资金"
- "预测金额"
- "预算采购金额"
- "预算金额金额"
- "采购预算价"
- "采购预算及最高限价"
- "预算金额(最高限价)"
- "总预算金额"
- "控制价"
- "控制价(元)"
- "控制价(万元)"
- "预算内资金"
- "预算项目总金额"
- "项目预算金额"
- "预算金额合计"
- "预算金额*"
- "项目概算"
- "预算采购额"
- "项目总预算"
- "计划投资"
- "计划投资(万元)"
- "投资金额"
- "总投资金额"
- "概算投资"
- "概算投资金额"
- "预算价格"
- "预算价"
- "预算价(元)"
- "预算价(万元)"
- "预算(万元)"
- "预算总价"
- "预算总价(元)"
- "总预算资金"
- "总投资"
- "预估金额"
- "预估金额(含税)"
- "预算单价"
- "预成交金额"
- "项目主要内容及采购预算金额"
- "项目政府采购预算价"
- "政府采购预算价"
- "采购总预算金额"
- "项目投资概算"
- "项目投资"
- "项目内容及预算控制金额"
- "项目内容及预算金额"
- "项目金额"
- "采购预算单价"
- "采购预算额度"
- "采购项目预算金额"
- "采购项目预算总金额"
- "采购项目预算"
- "采购内容及金额"
- "采购控制金额"
- "采购金额"
- "采购预算总金额"
- "采购预算资金"
- "采购限价"
- "采购限价(元)"
- "不含税预算"
- "预算金"
- "预算金额或上限价"
- "采购概算"
- "招标控制价"
- "招标控制价(元)"
- "招标控制价(万元)"
- "项目招标控制价"
- "确定招标控制价为"
- "投资总额"
- "工程概算投资(万元)"
- "投资总额(万元)"
- "投资规模"
- "投资概算"
- "投资额度"
- "投资额"
- "本招标投资额"
- "计划投资额"
- "建安投资额"
- "本项目投资"
- "本项目投资额"
- "招标工程投资额"
- "招标投资额"
- "工程概算投资额"
- "工程预算总造价"
- "本包预算金额"
- "本包预算金额(最高限价万元)"
- "服务投资额"
- "项目投资额"
- "项目概算投资额"
- "投资估算"
- "拟采购金额"
- "控制金额"
- "合同估算价"
- "工程投资规模"
- "工程总投资"
- "工程投资"
- "工程投资额"
- "工程总投资额"
- "工程概算总投资"
- "资金来源及预算金额"
- "资金来源及预算"
- "标段预算"
- "标段预估金额"
- "预成交价"
- "预计投资"
- "预计投资额"
- "预计标的"
- "招标金额"
- "工程控制价"
- "资金来源及投资额"
- "最高限价工期"
- "最高限价"
- "最高限价(人民币元)"
- "最高限价(万元)"
- "最高限价(万元)"
- "最高限价(元)"
- "本包预算价"
- "本项目最高限价"
- "项目最高限价"
- "预算控制"
- "预算最高费用"
- "预算采购资金"
- "预计采购金额"
- "本项目监理费"
- "财政预算金额"
- "项目预算最高限价"
- "标的金额"
- "本项目建安费"
- "本项目响应限价"
- "本项目上限价"
- "项目预算价"
- "概算"
- "估算总投资"
- "工程发包价"
- "招标控制价标价"
- "拟成交金额经费预算"
- "建设资金"
- "最高投标限价暂定"
- "采购预算最高限价子包1"
- "结算金额"
- "招标预算价"
- "本标段预算金额"
- "本招标项目预算"
- "采购控制价"
- "预算控制价"
- "采购项目金额"
- "采购预算及评标办法"
- "控制价合计"
- "工程预算"
- "合同包预算"
- "工程造价"
- "发包估价"
- "最高限额"
- "最高限额(万元)"
- "计划总投资"
- "项目总金额"
- "市场价单位"
- "招标的控制价格"
- "该项目预计采购金额"
- "招标项目投资额"
- "工程预算总造价金额"
- "标段预算价"
- "发包预算价"
- "暂估采购量预算"
- "采购人预算"
- "采购预估规模"
- "预估费用"
- "谈判采购招标的财政预算"
- "采购货物的预算金额"
- "项目限价"
- "项目上限金额"
- "工程最高限价"
- "拦标价"
- "拦标价(万元)"
- "总招标控制价"
- "拦标价(万元)"
- "招标上限控制价"
- "最高控制价"
- "最高报价上限"
- "分包及预算控制价"
- "工程合同估算价"
- "项目估算"
- "谈判控制价"
- "批准投资总额(万元)"
- "投资估算价"
- "工程概算"
- "项目概算(万元)"
- "项目预算为"
- "▲预算金额"
- "招标部分估价"
- "预算金额及资金来源"
- "项目内容及规模"
- "预算总价或上限价(人民币元)"
- "本次工程项目预算价为"
- "投资估算约(元)"
- "含税预算(元)"
- "预算价及最高限价"
- "预估不含税金额(元)"
- "预算金额及最高限价"
- "采购预算金额及最高限价"
- "项目总造价"
- "采购含税限价"
- "交易预估价为"
- "财政预算价"
- "预估采购规模"
- "预估含税总价(万元)"
- "含税总价限价"
- "项目的最高限价"
- "最高限价(如有)"
- "采购规模"
- "项目工程造价"
- "项目合同估算价为"
- "备注本项目最高限价"
- "采购项目最高限价(元)"
- "预算金额(不含税万元)"
- "采购预算及控制价"
- "采购控制价(万元)"
- "含税总规模(万元)"
- "项目范围与规模"
- "项目预估金额"
- "预算控制总价"
- "本项目采购总金额"
- "项目投标限价"
- "谈判采购预算"
- "项目估算总投资"
- "项目估算总投资为"
- "项目总投资"
- "本项目总投资额"
- "总投资额"
- "项目总投资额"
- "预算金额(含税元)"
- "最高限价金额"
- "最高限价金额(元)"
- "估算总金额"
- "项目总规模"
- "项目预算或最高限价"
- "项目投资估算价"
- "项目投资估算"
- "项目预算及最高限价"
- "预算/最高限价(元)"
- "最高限价(元)"
- "最高限价(万元)"
- "招标项目规模"
- "采购最高限价"
- "采购预算控制价"
- "本次采购最高限价为"
- "代理项目估算金额"
- "工程预算投资额"
- "报价总金额(元)"
- "规模及合同估算价"
- "招标控制价/审定造价"
- "标底价或概(预)算价"
- "招标预算金额"
- "项目估算价"
- "限价或预算"
- "规模(估算价)"
- "预计项目金额"
- "控制总价(元)"
- "招标控制价总价"
- "审定预算价"
- "最高限制单价(元)"
- "项目最高限价金额"
- "采购项目最高限价(元人民币)"
- "财政预算限额(元)"
- "招标估算金额"
- "招标估算价"
- "立项金额(万元)"
- "本最高投标限价"
- "最高限价总金额(元)"
- "最高投标限价总价"
- "本期概算(万元)"
- "预算控制最高价"
- "财政预算限额(元)"
- "本项目设置最高限价"
- "批预算金额"
- "预算安排"
- "最高限价(或招标控制价)(元)"
- "采购项目最高限价"
- "最低限价"
- "合理最低价"
- "品目预算(元)"
- "招标标底或预算"
- "项目控制价"
- "预计合同额(万元)"
- "本次发包工程估价"
- "最高限价总计"
- "包最高限价(元)"
- "包预算(元)"
- "预算额及最高限价(元)"
- "资金来源及预算控制金额"
- "含税最高限价"
- "本期预算"
|